Senior scheduling and delay expertise from the person doing the work

Independent CPM scheduling and forensic delay analysis for subcontractors, GCs, owners and counsel. 18-plus years building and taking apart construction schedules, from small fit-outs to major programs.

18+
years in project controls
PSP
AACE certified scheduler
Independent
on your project, no divided loyalty
Who you're working with
Mr. James, PSP
Founder · CPM Scheduler · Forensic Delay Analyst

Mr. James has 18-plus years in construction project controls, building and defending Primavera P6 schedules on hospitals, high-rise, federal and VA, sports, bridges, rail and mission-critical work, from small jobs to major programs. He holds the AACE Planning and Scheduling Professional (PSP) credential and works directly with subcontractors, GCs, owners and their attorneys on baselines, monthly updates, time impact analyses, REAs and forensic delay analysis under AACE RP 29R-03. He founded CPM Predictive Solutions so clients get the same scheduler on the phone who built the analysis. Every engagement is handled by Mr. James personally, small or large, never handed to a junior analyst.

Most project examples are identified by type and location to protect client confidentiality. References are available when we talk.

Proof

Projects we support

A sample, not a full list. Names withheld, references available on request.

Federal / VA

VA medical center, Virginia

Independent CPM consultant role, NAS compliant baseline and monthly updates under the federal spec.

Hospitals & Healthcare

Healthcare schedule support, Florida

Schedule evaluation across multiple healthcare projects in Central Florida, South Florida and the Gulf Coast. Ongoing review, progress validation, and risk flagged from sequencing, trade stacking and duration changes.

Electrical Sub

Electrical subcontractor, Charlotte, NC

Schedule and delay evaluation on a multifamily build, focused on the sub's exposure. Reviewed contract milestones and durations and tracked the record as delay was pushed down to the trades.

Electrical & Fire Alarm

Electrical subcontractor, Chapel Hill, NC

Schedule and delay evaluation for the electrical and fire alarm scope on a stalled multifamily project. Time impact analysis on building dry-in and predecessor delays, plus review of resequencing and acceleration.

Sports & Stadiums

Sports complex, Virginia

Mechanical contractor scope. Baseline plus logic and float protection on an aggressive, fixed-date build.

Rail & Transit

Heavy rail and infrastructure mega-program

Rail program spanning airport and intermodal construction, a 35 mile greenfield corridor, and a 129 mile high speed upgrade inside an operating right of way. Schedule, change and delay oversight built around track access and active operations.

Mission Critical

Mass burn waste-to-energy facility, design-build

Full plant scope: boiler, turbine generator, air cooled condenser, ash handling, and major mechanical, piping and electrical packages. Baseline development and updates on the resource and quantity loaded P6 schedule.

Industrial

Biosolids-to-fertilizer facility, EPC

Biosolids receiving and dryer system, granulation plant, and chemical and ammonia storage, with heavy mechanical, piping and electrical scopes. Baseline development and updates, integrating subcontractor schedules into the CPM master schedule.

High-Rise

Luxury high-rise, Miami Beach

Trade coordination and sequencing in South Florida, with extension of time support grounded in the schedule.

Who this is for

Small engagements get the same senior attention

The GC who owes the owner a real CPM schedule but can't justify a full-time scheduler. The sub in any trade handed a compressed schedule and told to make it work. Both get the same person and the same care as a large program.

Why it matters

Forensic experience, applied before trouble starts

Years of dissecting schedules in disputes show exactly how contractors lose time and money: hidden constraints, preferential logic, broken ties, artificial lags, and float paths that quietly shift risk. We bring that scrutiny to building and updating your schedule, so risk shows up before it becomes a dispute.

Standards & methods

Held to the same standards we use in a dispute

Built to recognized industry standards, so the schedule holds up in a pay application or a claim.

Schedule development per AACE RP 91R-16. Clear logic and realistic durations before work begins.
Schedule updating and maintenance. Updates that show actual progress, changed conditions, delays and the work remaining.
DCMA 14-point health checks. Every baseline and update screened for weak logic, excess constraints and missing ties.
Time impact analysis per AACE RP 52R-06. The effect of a change or delay modeled while the job is underway, when it can still be documented and addressed.
Forensic delay analysis per AACE RP 29R-03. Measuring and explaining delay after it happens.
How it works

Independent, discreet, and right-sized

01

Independent

A conflict check on every engagement, and the record drives the analysis.

02

Confidential

Your schedules, data and disputes stay private.

03

Affordable

Flat fees, per project or month to month. Start with one thing and scale only if the job needs it.

● Based in Florida. Scheduling, delay analysis and expert work nationwide.

Discuss your schedule or delay matter

Tell us what needs reviewing and your decision deadline. We will confirm the next step and the records needed. Counsel can start with a conflict check.