CPM scheduling for Georgia building, industrial and federal construction
We provide P6 baselines, monthly updates, schedule reviews and delay analysis for GCs, subcontractors and owners across Georgia. We build around the project's procurement, production, access and turnover requirements.
Written scope and flat fee. Quote back within one business day. Remote across Georgia, on site when it counts.
Swipe to see the full schedule
Different jobs fail in different places
A mid-rise in Metro Atlanta, a process plant and a federal job on the coast don't share a critical path. One runs through enclosure and inspections, one through equipment and startup, one through government reviews and access. We build the schedule around whatever actually controls your job.
Sequence, enclosure and occupancy
Structure to dry-in, then MEP rough-in and finishes by floor or area. Inspections, life safety testing and the certificate of occupancy sit on the critical path at the end, where float is usually gone. Phased occupancy needs its own turnover logic.
Equipment, utilities and startup
Long-lead equipment, vendor data and setting dates drive the work. Permanent power, process utilities and tie-ins have to land before startup, and commissioning runs system by system. A plant that stays in service adds outage windows and tie-in sequencing.
Reviews, reporting and access
Government review periods, cost-loaded updates and the reporting format all come from the contract's scheduling section. Coastal and harbor work adds marine access, tides and environmental restrictions where they apply.
The details that move Georgia dates
Scheduling while the job runs, analysis when it doesn't go to plan
P6 Baseline Development 91R-16
A baseline built to the contract's schedule spec, with the logic and loading the job type needs.
Monthly Updates & Narratives Monthly
Progress and remaining durations checked against the field, with a narrative on what moved and why.
Owner Schedule Review Owner
An independent check of the contractor's baseline and updates before you accept them.
Change Orders & TIA 52R-06
Prospective analysis of a change against the completion date. Cost support is prepared separately.
Forensic Delay Analysis 29R-03
Retrospective analysis of delay that already happened, with responsibility, notice and concurrency addressed.
REAs & Claims REA
Schedule and cost support behind a request for equitable adjustment or claim, and expert work if it goes further.
Federal and industrial work that applies here
Savannah federal work and relevant industrial experience. Project locations are identified where disclosed. Names withheld, references on request.
Harbor pump station and dissolved oxygen system, Savannah, GA
Lead scheduler on a large USACE environmental mitigation project. NAS compliant baseline with CLIN cost loading and balancing, SDEF export to RMS as that contract required, TIA change order reviews and @Risk modeling.
Mass-burn waste-to-energy plant, South Florida
Progressive design-build. Design sequencing and the full construction baseline: boilers, turbine generator, air cooled condenser and ash handling. Resource and quantity loaded P6, rules of credit for earned value, and a quantitative risk model in @Risk.
Biosolids-to-fertilizer manufacturing facility, EPC
Receiving, dryer, granulation, and chemical and ammonia storage. Cost and resource loaded schedule through startup, monthly earned value, and subcontractor schedules integrated into the CPM master.
Water and wastewater treatment plants
CPM scheduling, TIA and risk analysis on plants that stayed in operation during construction.
Questions from Georgia contractors and owners
Federal background reading: federal schedule specs compared · fragnets and TIAs on federal jobs
Nearby: the Carolinas · Florida
Running a job in Georgia?
Send the contract schedule section and your latest XER or PDF. A 20 minute call scopes the work, then you get a written scope and fee.