Forensic Delay Analysis

Delay analysis that shows what happened, and why

For contractors, subs, owners and counsel with a delay claim on the table. We take the contemporaneous schedules and project record, run the analysis under AACE RP 29R-03, and put the delay math in a report built for negotiation, mediation, arbitration or litigation.

PSP certified AACE RP 29R-03 Expert reports and rebuttals Testifying experience Primavera P6 Mediation, arbitration, litigation
Nationwide, handled remotely. Send the baseline, updates, as-built data and correspondence, and we build the analysis from the record. Recent work includes a default termination defense for a contractor in New Mexico and delay support for subcontractors in North Carolina, Virginia and Florida. Every engagement is handled by Mr. James, PSP, personally.
What we take on

We prepare claims and evaluate the ones you receive

We prepare delay claims and independently evaluate claims our clients receive. The method doesn't change. The record decides where the delay came from and what it did to the critical path.

01

Owner and third-party delay

Differing site conditions, utility conflicts, design changes, late approvals, permit and inspection holds, tied to the schedule and measured against the completion date.

02

Contractor delay defense

When a claim lands on your desk, we test the other side's analysis and the schedule under it, and separate the delay you own from the delay you don't.

03

Concurrent delay

Where most claims get argued. We identify concurrent delay, apportion it where the facts allow, and state how it affects time and compensability under the contract.

04

Acceleration and compression

Directed or constructive acceleration, trade stacking and out-of-sequence work, connected to the driving delay so the cost has a cause.

05

Lost productivity

Measured mile and related methods where the record supports them, so the claim rests on an unimpacted comparison, not total cost.

06

Time extension entitlement

How many calendar days are owed, which are excusable and compensable, and whether notice and contract requirements were met. While the job is running, that usually goes in an REA.

Methods per AACE RP 29R-03

The record picks the method, not the answer you want

RP 29R-03 lays out the recognized methods and when each applies. We pick from what schedules exist, what the contract requires, and whether the analysis happens during the job or after, then explain the choice in the report. An incomplete record does not rule out a useful analysis. Missing updates or PDF prints instead of native files, we assess what the available schedules and documents can support and state the limits.

Contemporaneous windows MIP 3.3 / 3.4

The updates as they existed during the job, analyzed period by period. Our default when a real update record exists, because it shows the critical path as the project team saw it.

Progress vs. non-progress split MIP 3.4

Each window separates what progress did to the completion date from what schedule revisions did. Logic, duration and scope changes don't hide inside a progress update.

Time impact analysis RP 52R-06

The prospective method for a change or delay while the job is running: a fragnet inserted into the current update, impact measured before and after. Many contracts name it for time extension requests.

Collapsed as-built MIP 3.8 / 3.9

The as-built with the delay events removed, showing when the job would have finished without them. Used when the update record is thin and the as-built can be reconstructed with confidence.

As-planned vs. as-built MIP 3.1 / 3.2

The baseline against what actually happened, in one pass or in periods. Readable, and fits a narrow dispute or a record that won't support a dynamic method.

Schedule validation DCMA / 29R-03

Before any method runs, the baseline and updates are validated. Open ends, constraints, lags, calendar errors and out-of-sequence progress are corrected or disclosed.

Why it holds up

Delay math, backed by the record

What the other side will attack

Every delay claim gets tested on the schedule, the method and the math

An opposing expert will attack the schedule, the method choice, and whether the day count survives a recalculation. Schedules are validated first. The method is chosen from RP 29R-03 for reasons stated in the report. Every calendar day traces to a critical path activity, a driving relationship and a document in the record. Logic, calendars, constraints and total float decide what was critical, not narrative.

Forensic methodology per AACE RP 29R-03 · TIA per RP 52R-06 · Validation per DCMA 14-point
How it works

From the first call to the report

01Intake. We review the contract, notice provisions, the claim and where the dispute sits. You get a scope and fee before analysis starts.
02Record assembly. Baseline and updates in native P6, dailies, RFIs, change orders, correspondence and minutes. We tell you what is missing and whether it matters.
03Schedule validation. Each schedule is checked before it carries any weight. Defects are corrected or disclosed, never silently worked around.
04Analysis. Method selected from RP 29R-03 for stated reasons, run window by window or event by event, and reconciled to the as-built record.
05Report and support. Findings, exhibits and day count in a report written for your forum. Rebuttal, deposition and testimony as needed.
What you get

Scaled to where the dispute sits

NEGOTIATION

Delay analysis and summary

Critical path findings and day count in a report written for a change order negotiation or claim submission. Often enough to settle it before it becomes a dispute.

MEDIATION / ARBITRATION

Expert report and rebuttal

A full expert report with exhibits, schedule comparisons and the document trail. Rebuttal reports that take the opposing analysis apart point by point.

LITIGATION

Testimony and counsel support

Deposition and hearing testimony, support for counsel through discovery, and plain-language exhibits a panel or judge can follow.

Delay work

Recent delay analysis work

A sample, not a full list. Names withheld, references available on request.

Electrical & Fire Alarm Sub

Multifamily, Chapel Hill, NC

Delay evaluation for the electrical and fire alarm scope on a stalled multifamily project. Time impact analysis on building dry-in and predecessor delays, plus review of resequencing and acceleration pushed down to the trade.

Electrical Sub

Multifamily, Charlotte, NC

Schedule and delay evaluation focused on the subcontractor's exposure. Contract milestones and durations reviewed against the contemporaneous record as delay was passed down from the GC.

Owner Side

Healthcare projects, Florida

Independent schedule and delay evaluation across multiple healthcare projects. Progress validated and delay exposure flagged from sequencing, trade stacking and duration changes.

General Contractor

Municipal Sewer Reconstruction, New Mexico

Default termination defense and delay claim for the contractor. Period-by-period as-planned vs. as-built analysis (MIP 3.2) built from PDF schedule prints and the as-built XER, isolating owner review delay and a disputed constructive change.

Who retains us

Whoever needs the delay measured correctly

01

Subcontractors

Every trade (mechanical, electrical, plumbing, fire protection, site and more), pushing back on delay handed down or making the case for time and cost owed.

02

General contractors

Claims for owner-caused delay, and defense against sub pass-through claims and liquidated damages.

03

Owners and developers

Independent evaluation of an incoming contractor claim before time or money is granted, and support when assessing damages.

04

Counsel and sureties

Retained by construction attorneys and surety claims teams as the scheduling and delay expert, working under counsel's direction on confidentiality, disclosure and deadlines.

Delay claim FAQ

Questions we get on delay claims

Do you take delay and claims work outside Florida?
Yes. The work runs from the schedule files and project record, so location doesn't matter. We have handled claims in New Mexico and across the Southeast. Testimony travel is billed at cost.
Our delay came from a utility conflict or an unforeseen site condition. Can we recover the time?
Usually, if the event is outside your control under the contract, it drove the critical path rather than consumed float, and notice requirements were met. We test all three against the record first.
What do you need from us to start?
The contract, the baseline and updates in native P6, daily reports, RFIs, change orders and the correspondence around the delay. If the record is incomplete, we tell you what that does to the method and confidence.
We only have a baseline and a handful of updates. Is that enough?
Often, yes. A thin record points to as-planned vs. as-built or collapsed as-built instead of windows. It costs some precision and can limit the conclusions, and the report says so.
Do you write expert reports and testify?
Yes. We prepare expert and rebuttal reports for mediation, arbitration and litigation, and give deposition and hearing testimony when needed. The report is written to be defended, not just read. See expert reports and testimony.
We are defending a claim, not making one. Do you do that?
Yes. We check the claim's schedules, test the method against RP 29R-03, recalculate the day count, and identify the concurrent and contractor-caused delay it leaves out.
How long does a delay analysis take?
It depends on the record and the forum. A single-event analysis for a change order negotiation can take weeks. A full expert report on a multi-year job takes longer. We scope it on the first call and hold to counsel's or the claim procedure's deadline.

Discuss your delay matter

Send the contract, the schedules and a short description of the delay, even if the record is incomplete. We will tell you what it supports, which method fits, and what it takes. Counsel can start with a conflict check.