CPM scheduling for Tampa Bay healthcare, multifamily and commercial work
We provide P6 scheduling, independent reviews and delay analysis across Tampa Bay and the Gulf Coast. We help GCs maintain the master schedule, subcontractors document changes to their work, and owners evaluate the plan and reported progress.
Written scope and flat fee. Quote back within one business day.
Occupied buildings and stacked trades set the dates
Hospital renovations, occupied buildings, multifamily and commercial projects can be controlled by access, area releases and turnover as well as construction production. We link those requirements to the work and test which path governs completion.
How we schedule the work that slips first
Shutdowns and phased work in operating facilities
Every shutdown is an activity with its request, approval lead time and work window. Phases tie to the owner's turnover and move-in dates. When a shutdown gets cancelled or shortened, the update shows it as a delay with a cause, not slow production.
Area releases and trade sequencing
We break the building into the areas the trades actually work and link each trade to the release ahead of it. That makes trade stacking visible before it happens, and it shows who held an area when the sequence breaks.
Procurement, enclosure and turnover
Submittals, approvals, fabrication and delivery for long-lead items are in the logic, not on a separate log. Dry-in drives interior work, and turnover is scheduled by area with inspections and punch, so the finish date has real activities behind it.
Weather allowance versus actual weather
We carry the contract's weather allowance in the baseline and log lost days against the work they stopped each update. At the end of the period the comparison is simple: days lost on critical work against the allowance. Hurricane season is one part of it. Summer afternoon storms take hours that most baselines never plan for.
Recovery plans and documented changes
A recovery schedule has to show the crews, shifts or resequencing that make the dates work. Changes go in as fragnets with a time impact analysis, so time is settled with the change, not argued at closeout. Cost support stays separate from the time analysis.
The monthly piece of this lives in our monthly updates and narratives →
Same schedule, different job depending on your seat
General contractors
Build and maintain the master schedule, pull sub schedules into it, and keep updates the owner can accept.
Subcontractors
Track what the GC's schedule does to your durations and float, and get notice out on time when the sequence changes under you.
Owners
An independent read on the contractor's plan, reported progress and recovery claims before you approve the pay app or the extension.
Healthcare and multifamily work we have done
A sample, not a full list. Locations as stated. Names withheld, references on request.
Healthcare schedule support, Gulf Coast, Central and South Florida
Owner-side schedule evaluation across multiple healthcare projects, including Gulf Coast work. Ongoing review, progress validation, and risk flagged from sequencing, trade stacking and duration changes.
Luxury high-rise, Miami Beach
Owner-side review of the schedule and trade sequencing, with extension of time support grounded in the schedule.
Questions from Tampa Bay GCs, subs and owners
When it's already a dispute: forensic delay analysis · delay notice letters · schedule compression
Elsewhere in Florida: Florida overview · Orlando · Miami · Jacksonville
Running a job on Tampa Bay or the Gulf Coast?
Send the contract schedule section and your latest update. A 20 minute call scopes the work, then you get a written scope and fee.