An independent health check on the schedule, before it costs you time
We review your schedule or the GC's, run the DCMA 14-point health check, audit the logic and float, and hand you a plain-language report on where it's weak and where it's quietly taking your time. Primavera P6 or Microsoft Project, backed by years of forensic schedule analysis.
Flat fee per review. Report within a few business days, with scorecard, findings and action list.
Swipe to see the full schedule
The GC's schedule is built around the GC's priorities, not yours
As a sub, you live with a schedule someone else built and controls. A clean-looking Gantt can hide compressed durations, missing logic, hard constraints holding unsupported dates, and float absorbed off your scope. An independent check finds it while you can still act.
Built for every trade. More on schedule changes and compression: Subcontractor scheduling and when schedules get compressed.
The DCMA 14-point check, logic and float, in one report
Scored like an owner's reviewer, read like a forensic analyst, explained in plain language.
Example: a schedule that looks fine in the Gantt but flags hard constraints, negative float and a CPLI of 0.89.
Logic & Float Audit Network
Missing ties, open ends, redundant logic, inserted lags, and float absorbed off your scope.
DCMA 14-Point Health Check Score
The 14-metric assessment owners and agencies use, with pass, warn or fail on each check.
Critical Path & Longest Path Risk
Confirms the critical path is driven by real work, not constraints or non-long-lead procurement propping up dates.
Constructability & Sequencing Field
Can the sequence be built, with the inspections, dry-in and milestones your scope depends on?
Calendars, Codes & Constraints Compliance
Checked against the contract and spec, so nothing hides the real path.
Written Report & Action List Deliverable
Scorecard, findings, and an action list of what to fix or flag.
The flaws that quietly cost a trade time and money
An expert review, without taking the schedule out of your hands
Send us the schedule
Your P6 (.xer or .xml) or Microsoft Project (.mpp) file, plus the spec section on a federal or owner job. Yours or the GC's.
We run the health check
DCMA 14-point plus a logic and float audit, so the metrics and the network both get checked.
We read it like a reviewer and an analyst
Constructability, sequencing, the critical path, and where a slip or claim would land.
You get the report
Scorecard, plain-language findings and an action list.
You stay in control
We review and flag, we don't take over. If you want us to apply the fixes or take the findings to the GC, we can.
Check the federal schedule against the spec before you're the one holding it
On VA, USACE and NAVFAC work the schedule has to meet the incorporated spec (NAS, cost loading and exports where required) and usually the DCMA checks. We review it to the agency requirement, so a sub knows whether the GC's schedule holds up or is burying their time.
DCMA 14-point check, NAS and SDEF review, formatted to the agency specSchedule review questions