CPM scheduling for Maryland federal, research and occupied-facility construction

We provide P6 baselines, monthly updates, independent reviews and delay analysis for contractors and owners across Maryland. Access, approvals, equipment, shutdowns, testing and operational turnover need to be tied to the work they govern.

Written scope and fee, quote back within one business day. Direct access to the analyst doing the work.

AACE PSP Primavera P6 Built to the incorporated spec Startup and commissioning logic AACE RP 52R-06 AACE RP 29R-03
What drives the schedule

Access, shutdowns and acceptance govern the finish

On federal, research and healthcare work, the last months of the job are rarely about construction alone. Equipment readiness, testing, commissioning and the owner's acceptance often decide the finish. We put them in the logic from the baseline on.

01

Badging, escorts and restricted deliveries

Workforce badging, escort availability, delivery inspection and limited work areas all take time. We schedule them as activities with lead times, not as assumptions buried in crew durations.

02

Shutdowns and temporary services

Utility shutdowns, temporary power and ventilation, and pressure relationships in occupied labs and clinical spaces need approvals and fixed windows. Each one is tied to the work it releases.

03

Equipment readiness and installation

Lab, medical and building system equipment moves through submittal, fabrication, delivery, setting and utility connection. Each step is linked to the room or system it depends on.

04

Startup, testing, commissioning and acceptance

Startup, TAB, functional testing, integrated testing and owner acceptance each get durations and logic. The finish date reflects the sequence the owner will actually sign off on.

Contract-specific

Built to the section in your contract

Federal work in Maryland can fall under USACE, NAVFAC, VA or other agency specs, and each asks for different deliverables: cost loading, native XER files, SDEF export to RMS where required, specific narrative content and update dates. Research and healthcare owners often write their own. We read the incorporated section, build the submittal list from it, and set up the exports the contract calls for.

Federal and agency scheduling →   Federal schedule specs, QCS and RMS →

What we deliver

Contractor reporting and owner oversight

Contractors need a schedule the owner will accept and a record that holds up. Owners need to know whether the reported progress is real.

Baseline through acceptance Baseline

Access, shutdown, equipment and commissioning activities in one network, built to the contract's section.

Monthly reporting Monthly

Updates statused against the field record, with the narrative, exports and cost loading the spec requires.

Independent owner review Owner

For agencies, research institutions and health systems: a written review of the contractor's baseline and updates.

Federal fragnets and TIA 52R-06

For government changes and late government-furnished items: a fragnet measured against the contract completion date.

REA and claims support REA

The time analysis behind an REA or claim, with cost support handled separately.

Forensic delay analysis 29R-03

Retrospective analysis and expert support when the delay is already in the past.

Hospital and clinical detail is on our healthcare scheduling → page. Putting the owner on notice? See what a delay notice letter needs →

Experience

Related work, at its real location

Relevant federal, healthcare and operating-facility experience. Project locations are identified where disclosed. Names withheld.

Federal / research

High-containment laboratory, federal campus

Monthly updates and schedule review.

Federal / VA

VA medical center, Virginia

Independent CPM consultant under the VA Network Analysis Schedule spec. NAS compliant baseline, cost loading and monthly updates tied to progress payments.

Healthcare / owner side

Healthcare schedule support, Florida

Owner-side schedule evaluation across multiple healthcare projects in Central Florida, South Florida and the Gulf Coast. Progress validation and risk flagged from sequencing, trade stacking and duration changes.

Live facilities

Water and wastewater treatment plants

CPM scheduling, TIA and risk analysis on plants that stayed in operation during construction.

Maryland FAQ

Questions we get on Maryland federal and research work

How do you schedule work on a controlled-access federal site?
Badging, escorts, restricted deliveries and limited work areas go into the schedule as activities with lead times. Site access itself follows your contract's requirements. Most of our work is done from the schedule files and project records.
Our lab job is waiting on owner acceptance. How should the schedule show that?
Break acceptance into the steps the owner actually requires: startup, TAB, functional testing, integrated testing, punch and acceptance inspections. Each gets a duration and logic. A late owner inspection is then visible as its own event.
The owner moved our utility shutdown twice. Do we get time?
Possibly. We insert the moved shutdown into the update in effect at the time and measure the effect on completion. Entitlement still depends on the contract, notice and any concurrent delay, not the P6 result alone.
Can you review a contractor's schedule for a research or healthcare owner?
Yes. We review the baseline for logic, constraints and how it handles shutdowns and commissioning, then check each update's reported progress against the record. You get written comments the contractor can answer.
What file formats can you deliver on a federal contract?
Whatever the incorporated section requires. That might be native P6 XER files, PDF reports in a set layout, cost-loaded data or an SDEF export to RMS where required.

Also nearby: Northern Virginia · Virginia overview · Hampton Roads · Richmond

Working on a Maryland project?

Send the scheduling section and the latest schedule if there is one. A 20 minute call scopes the work, then you get a written scope and fee.