Fire protection scheduling consultant for sprinkler contractors
Sprinkler work runs on gates other trades never see: AHJ approval before fabrication release, sprinkler mains in a crowded ceiling, hydro tests holding close-in, and a final inspection between the project and occupancy. We build P6 schedules that carry those gates, and document it when the job funnels its delay into your window.
The constraints that actually drive a fire protection schedule
“Fire sprinkler” as one bar on a GC schedule ignores the approval gate, fabrication flow and inspection chain that run your work. Each gate below goes into your CPM.
Your final inspection sits in front of occupancy
Every delay funnels toward turnover, and your final sits at the front of that gate. Whoever drove the slip, the story becomes that sprinkler is holding up TCO, unless the record says otherwise.
How compression and stacking hit your crews and margin: When schedules get compressed → More on protecting a sub's time: Subcontractor schedule protection →
A scheduler in your corner who has built this scope before
A baseline built to your means and methods
Your approval and fabrication chains, area sequence, and test and inspection flow, on record before anyone edits the plan you priced.
Monthly updates that keep the record
Narratives that log held approvals, late area releases and close-in holds as they happen, so the real driver of the finish is on record.
Logic and float audits on the GC schedule
We check for compressed durations, flipped ties and float taken from your scope, and show where your time went.
Time impact analysis on changes and delay
TIA per AACE RP 52R-06 on revisions, held areas and acceleration. The time request rests on the schedule, and cost is documented separately.
Work we have scheduled
Names withheld, references available on request.
Mass burn waste-to-energy facility, design-build
Full plant scope: boiler, turbine generator, air cooled condenser, ash handling, and major mechanical, piping and electrical packages. Baseline and updates on the resource and quantity loaded P6 schedule.
Biosolids-to-fertilizer facility, EPC
Biosolids receiving and dryer system, granulation plant, and chemical and ammonia storage, with heavy mechanical, piping and electrical scopes. Baseline and updates, with subcontractor schedules integrated into the CPM master.
Questions we get from sprinkler contractors
Tired of being the trade “holding up TCO”?
Send the GC’s latest update and your bid schedule. On a 20 minute call we'll talk through the TCO path as you see it and scope a review of your durations and float, with a fee.