High-rise and multifamily scheduling
Floor cycles, dry-in, hoisting and the inspections that close in each floor drive these jobs. We build and review P6 schedules for GCs, subs and owners that show the real path to the CO.
What drives a high-rise or multifamily schedule
Repetitive floors look simple until one slips. The schedule has to show how each floor releases the next trade and the next floor.
Where these jobs lose time
More on compression: When schedules get compressed → Subs: Schedule protection →
Scheduling and review built on the floor cycle
Baselines built on the floor cycle
P6 baselines with the structure cycle, dry-in, hoisting, rough-in, inspections and close-in by floor.
Monthly updates and narratives
Progress validated floor by floor, with resequencing and stacking documented as they happen.
Logic and float reviews for subs
We check the GC's schedule for compressed durations, flipped logic and total float taken from your scope.
Time impact and delay analysis
TIA per AACE RP 52R-06 on dry-in and predecessor delays measures the completion-date impact, with cost documented separately.
Recent high-rise and multifamily work
Names withheld, references available on request.
Luxury high-rise, Miami Beach
Trade coordination and sequencing in South Florida, with extension of time support grounded in the schedule.
Electrical subcontractor, Charlotte, NC
Schedule and delay evaluation on a multifamily build, focused on the sub's exposure. Reviewed contract milestones and durations and tracked the record as delay was pushed down to the trades.
Electrical subcontractor, Chapel Hill, NC
Schedule and delay evaluation for the electrical and fire alarm scope on a stalled multifamily project. Time impact analysis on building dry-in and predecessor delays, plus review of resequencing and acceleration.
Questions we get on high-rise and multifamily jobs
Discuss your high-rise or multifamily schedule
Tell us what needs reviewing and your decision deadline. We will confirm the next step and the records needed.