Plumbing scheduling consultant for plumbing subs
Plumbing is first in the dirt and one of the last out, with a long middle where the job can eat your time: underground gated by pours, risers by structure, top-out by inspections, fixtures by finishes. We build P6 schedules that carry every gate, and document it when someone else's delay stretches the time between them.
The constraints that actually drive a plumbing schedule
One “plumbing rough-in” bar hides four crew flows and a testing chain. Each gate below goes into your CPM, because each can cost you time.
First in, last out, and stretched in the middle
Plumbing is on the front end, the back end, and through a long middle that belongs to other trades. When the middle stretches, you carry supervision, general conditions and remobilizations through months the bid never priced, and nobody sends a change order.
How compression and stacking hit your crews and margin: When schedules get compressed → More on protecting a sub's time: Subcontractor schedule protection →
A scheduler in your corner who has built this scope before
A baseline built to your means and methods
Your bid logic, stack and unit sequence, testing chain and crew flow, on record before anyone edits the plan you priced.
Monthly updates that keep the record
Narratives that log held pours, out-of-sequence releases and inspection holds as they happen, not reconstructed later.
Logic and float audits on the GC schedule
We check for compressed durations, flipped ties and float taken from your scope, and show where your time went.
Time impact analysis on changes and delay
TIA per AACE RP 52R-06 on change orders, held areas and extended duration. The time request rests on the schedule, and cost is documented separately.
Work we have scheduled
Names withheld, references available on request.
Mass burn waste-to-energy facility, design-build
Full plant scope: boiler, turbine generator, air cooled condenser, ash handling, and major mechanical, piping and electrical packages. Baseline and updates on the resource and quantity loaded P6 schedule.
Biosolids-to-fertilizer facility, EPC
Biosolids receiving and dryer system, granulation plant, and chemical and ammonia storage, with heavy mechanical, piping and electrical scopes. Baseline and updates, with subcontractor schedules integrated into the CPM master.
Questions we get from plumbing subs
On site months longer than you bid?
Send the GC’s latest update and your bid schedule. On a 20 minute call we'll hear how the job got stretched and tell you which records a duration review needs and what it costs.