Road, highway and heavy civil scheduling
Phased MOT, utility relocations, weather and agency specs drive road and site work. We build and review P6 schedules for heavy civil GCs, subs and public owners, and analyze delay when a job ends up in dispute.
What drives a heavy civil schedule
Road and utility work is controlled by things outside the contractor's hands. The schedule has to carry them as real activities so their effect is visible.
Where heavy civil jobs lose time
When it turns into a dispute: Forensic delay analysis →
Scheduling and delay work for heavy civil
Baselines built to the spec
P6 baselines to DOT or municipal requirements, with MOT phases, utilities, weather calendars and quantity-based durations.
Monthly updates with production tracking
Progress measured against planned production, with changes and conflicts documented as they happen.
Time impact analysis
TIA per AACE RP 52R-06 on utility conflicts, differing site conditions and owner changes measures the completion-date impact, with cost documented separately.
Forensic delay analysis
Delay analysis under AACE RP 29R-03, with the method chosen from what the record supports, even when that record is PDF prints.
Recent heavy civil work
Names withheld, references available on request.
Municipal sewer reconstruction, New Mexico
Default termination defense and delay claim for the contractor. Period-by-period as-planned vs. as-built analysis (MIP 3.2) built from PDF schedule prints and the as-built XER, isolating owner review delay and a disputed constructive change.
Florida intercity rail program, Orlando extension
Owner's-side schedule, change and delay oversight on a corridor with 156 crossings and 37 bridges, scheduled around track access and active operations.
Questions we get on road and heavy civil jobs
Discuss your road or heavy civil schedule
Tell us what needs reviewing and your decision deadline. We will confirm the next step and the records needed.